Our work

Kitchens, bathrooms and tiling in Reading

Real jobs by SJF Property Developments, photographed on site. Each one is shown in stages, from how it looked before to the finished room. Use the arrows, or tap a stage, to step through.

Jobs, stage by stage

En-suite shower room

Taken back to the studs and rebuilt · 5 stages

The old en-suite: white wall tiles, a sliding shower door, a white vanity unit and a stone-effect floor.

The old en-suite: white wall tiles, a sliding shower door, a white vanity unit and a stone-effect floor.

Kitchen refit

From the old kitchen to the finished room · 4 stages

The old kitchen before work started: cream units, wood-effect worktops and white floor tiles.

The old kitchen before work started: cream units, wood-effect worktops and white floor tiles.

Bathroom with corner bath

Stripped out, rebuilt and finished · 3 stages

The bathroom stripped out, with the old bath still in the room.

The bathroom stripped out, with the old bath still in the room.

Walk-in shower

An old shower enclosure replaced · 3 stages

The old shower: a worn tray, stained grout and a blue wall panel.

The old shower: a worn tray, stained grout and a blue wall panel.

Family bathroom

From the old bathroom to the finished room · 7 stages

The old bathroom before work started: a bath with a folding screen, beige wall tiles, a black tiled floor and a textured ceiling.

The old bathroom before work started: a bath with a folding screen, beige wall tiles, a black tiled floor and a textured ceiling.

Kitchen fit

Grey shaker kitchen with a Belfast sink · 3 stages

Grey shaker units and worktops fitted, with the splashback wall still to finish.

Grey shaker units and worktops fitted, with the splashback wall still to finish.

Marble-effect tiling

Large-format wall and floor tiles · 2 stages

Large marble-effect wall tiles going up, held flat with levelling clips.

Large marble-effect wall tiles going up, held flat with levelling clips.

Bathroom floor tiling

Grey floor tiles in a dark-tiled bathroom · 2 stages

Large grey floor tiles going down, held level with tile clips.

Large grey floor tiles going down, held level with tile clips.

Fence replacement

Old panels out, new panels and posts in · 2 stages

The old red-stained fence at the end of the garden.

The old red-stained fence at the end of the garden.

On site

Work in progress

More photos taken on site.

An old bathroom stripped out, with the floor and walls exposed.
Bathroom strip-out
A bathroom taken back to the studs, with new pipework in place.
Back to the studs, new pipework
Insulation boards stacked in a stripped room, ready to go in.
Insulation going in
A long room stripped and boarded, ready for the next stage.
Stripped and boarded
Large white wall tiles and grey floor tiles going in, with levelling clips.
Wall and floor tiling
A tiled room with levelling clips still in place, looking towards the door.
Tiling under way
A shower tray in place with the walls tiled around it.
Shower tray in, walls tiled
A tiled shower room with a new vanity unit fitted under the window.
Vanity unit fitted
A tiled shower area beside a window, ready for the screen.
Shower area tiled
A garage with new black interlocking floor tiles, a white ceiling and brick walls.
Garage floor tiles

Free quotes

Like what you see?

Call or WhatsApp Sam to talk about your job and arrange a visit.